1. Remove the rubber sealing caps from the ends of the MC4 connectors in the CEP. 2. Plug the Positive and Negative MC4 Connectors from the solar panels directly into the CEP. ![][1] 3. Locate the positive and negative cables exiting the CEP and route these to the GP-RVC30-MPPT Solar Charge Controller. [1]: htt…
1. Locate the refrigerator vent on the roof of the RV. Remove vent cover to gain access to the duct opening. 2. Drill a hole through the side of the vent (5/8” hole). 3. Remove any sharp edges from the hole. 4. Insert a rubber grommet (not included) into the hole. 5. Insert the MC4 Positive and Negative Extension …
**WARRANTY LENGTH** The Go Power! warranty is valid against defects in materials and workmanship for the specific product warranty period. It is not valid against defects resulting from, but not limited to: **• Misuse and/or abuse, neglect or accident ** **• Exceeding the unit’s design limits ** **• Improper insta…
Please unpack and make sure all parts shown in the list below are included in the kit. If any parts are missing please contact the Go Power! customer service team at [email protected] or 1.866.247.6527. ![][1] ![][2] [1]: https://hf-files-oregon.s3.amazonaws.com/hdpgopower_kb_attachments/2022/05-16/…
![][1] [1]: https://hf-files-oregon.s3.amazonaws.com/hdpgopower_kb_attachments/2023/09-12/802bab2f-3e15-4632-83bf-aee4cc5d3b12/toolsrequired.png
**INSPECTION** After installing any Go Power! Solar Kit or any other Go Power! products, all modules, electrical and mechanical components and connections should be inspected annually by a trained Go Power! or dealer representative or other qualified personnel for safe electrical and mechanical connections and to ens…
![][1] [1]: https://hf-files-oregon.s3.amazonaws.com/hdpgopower_kb_attachments/2022/07-19/fc04e11a-b7fb-4fa0-b033-09d089cb0625/Screen_Shot_2022-07-18_at_10.07.41_PM.png
1. Locate the refrigerator vent on the roof of the RV. Remove vent cover to gain access to the duct opening. 2. Thread MC4 Positive and Negative Extension Cables carefully through the screen and into opening. 3. Enlarge screen grid hole if necessary. 4. Remove any sharp edges from the hole. 5. Avoid strapping the …
![][1]**Ensure the Solar Panels are covered. Cover the panel faces completely with an opaque material to stop the production of electricity when working with panels or wiring – the cardboard shipping boxes are the perfect option to cover glass surface of the panels. ** 1. Use the templates included in the GP-RVC-30-M…
1. Check all electrical connections and ensure all cables are securely fastened 2. Install the Fuse into the fuse holder, ensure the fuse holder is securely fastened 3. Remove the opaque material from the solar panels 4. Follow the solar charge controller user manual and operating steps![][1] [1]: https://hf-fi…